Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | Yes |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hydrogen Jumbo Tube Skid Container For Industrial Gas Storing, Transportation
The H2 long-tube trailer is the gas source of the H2 filling substation. It also can transport CNG for the civil gas system. It is an effective supplementary method to the pipe conveyance of gas. Its technology is simple and it occupies small ground.
Advantage
Model
|
volume
|
external diameter
|
weight
|
Total length
|
working pressure
|
Design wall thickness
|
Material Science
|
BW559-2380-25LL
|
2380
|
559
|
2840
|
11582
|
20
|
16.5
|
4130X
|
BW559- 2250-20LL
|
2250
|
559
|
2685
|
10950
|
20
|
16.5
|
4130X
|
BW610- 520-16. 6L
|
520
|
610
|
603
|
2428
|
16.6
|
15
|
4130X
|
BW610- 470-16.6L
|
470
|
610
|
555
|
2235
|
16.6
|
15
|
4130X
|
BW610- 440-16 .6L
|
440
|
610
|
527
|
2120
|
16.6
|
15
|
4130X
|
BW720- 3780-20L
|
3780
|
720
|
4514
|
10900
|
20
|
21.3
|
4130X
|
BW720- 3840-20L
|
3840
|
720
|
4584
|
11150
|
20
|
21.3
|
4130X
|
BW720- 4010-20L
|
4010
|
720
|
4769
|
11600
|
20
|
21.3
|
4130X
|
BW720- 4170-20L
|
4170
|
720
|
4954
|
12050
|
20
|
21.3
|
4130X
|
BW720- 4200-20L
|
4200
|
720
|
4987
|
12130
|
20
|
21.3
|
413
|
Our factory has a professional technical team and advanced welding technology. We have engaged in R&D of Normal Temperature Storage & Transportation Equipment, Cryogenic Storage & Transportation Equipment, Chemical Equipment and other types of Energy/Chemical Storage & Transportation Equipment, and Oil & Gas Industry Pipeline EPC Services since 2005. Owing to the advanced technology, we guarantee the highest quality by controlling and supervising every detail.
OTHER DATA CAN BE CUSTOMERIZED BY NEED. PLEASE CONTACT US
https://jshuayan.en.made-in-china.com/contact-info.html
1. What are the main components of a CNG long tube trailer?
1. trailer
2. framework
3. large-cubage seamless steel cylinders
4. for safety cabin
5. back operation cabin
5. What's the delivery time?
If they are the standard models and are in stock, then we can ship them out within 10 -15 days after payment.
If customized, 15-20 days can be ready for shipment.